top of page

ETC

COPPER SMELTING C-WHB TUBE  ​

COPPER SMELTING C-WHB TUBE

  • LS Nikko #2 C-WHB Tube (2019, SUNWOO)

  • TSL-WHB OUTPUT DUCT IMPROVEMENT      (2018, GRM)

  • C-WHB MODIFICATION TUBE REPLACEMENT 
    (2017, LS Nikko) 

  • C-WHB TUBE PANEL (2017, LS Nikko) 

  • GRM TSL-WHB TUBE REPLACEMEN, T #3 BANK INSTALLATION (2013, SUNWOO)

COPPER SMELTING ESP DUST COLLECTOR

COPPER SMELTING ESP DUST COLLECTOR

  • NO.1 ESP DUST COLLECTOR MANUFACTURING & REPLACEMENT (2017, LS Nikko) 

  • NO.2 ESP DUST COLLECTOR MANUFACTURING & REPLACEMENT (2017, LS Nikko)

  • LS-NIKKO FSF EP DUST COLLECTOR MANUFACTURING & REPLACEMENT            (2007, SUNWOO) 
     

ALUMINIUM ANNEALING FURNACE  ​

ALUMINIUM ANNEALING FURNACE

  • 30TON/CH AL ANNEALING FURNACE            (2005, DAEHO AL.)

  • 20TON/CH AL ANNEALING FURNACE            (2003, DAEHO AL.)

  • SAMSUNG COARNING MIRROR MELTING FURNACE (KO4 C/R TANK) REPLACEMENT    (2003, POSCO CHEMTECH)

  • NO1 CGL POT RADIANT TUBE BURNER          (2002, JINBANG STEEL)

  • NO2 GGL FLUX DRYER CHAMPER (BURNER) REPLACEMENT (1999, 2002 JINBANG STEEL)

  • 5TON/DAY ASH MELTING FURNACE              (2002, POSCO CHEMTECH)

  • SAMSUNG PRECISION CHEMICAL BRAZIER 
    MANUFACTURING & INSTALLATION              (2001, POSCO CHEMTECH

bottom of page